Facilities


30 MW Production FacilityAscent Solar's 1.5 megawatt (MW) production line (FAB1) has been in production since 2009. The 30 MW production facility (FAB2) in Thornton, Colorado, will begin production with an annual rated production capacity of approximately 15 MW in the first half of 2010 and will ramp up to full annual rated production capacity by the end of 2010.